ISTQB
Foundation Sample Question Paper No. 10
1.
Designing the test environment set-up and identifying any required
infrastructure
and tools are a part of which phase
a) Test Implementation and
execution
b) Test Analysis and Design
c) Evaluating the Exit Criteria
and reporting
d) Test Closure Activities
2. Test
Implementation and execution has which of the following major tasks?
i. Developing and
prioritizing test cases, creating test data, writing test procedures and
optionally preparing the
test harnesses and writing automated test scripts.
ii. Creating the test suite
from the test cases for efficient test execution.
iii. Verifying that the
test environment has been set up correctly.
iv. Determining the exit
criteria.
a) i,ii,iii are true and iv
is false
b) i,,iv are true and ii is
false
c) i,ii are true and iii,iv
are false
d) ii,iii,iv are true and i
is false
3. A Test
Plan Outline contains which of the following :-
i. Test
Items
ii. Test
Scripts
iii. Test
Deliverables
iv.
Responsibilities
a) i,ii,iii are true and iv
is false
b) i,iii,iv are true and ii
is false
c) ii,iii are true and i
and iv are false
d) i,ii are false and iii ,
iv are true
4. One of
the fields on a form contains a text box which accepts numeric values in
the range
of
18 to
25.Indentify the invalid Equivalance class
a) 17
b) 19
c) 24
d) 21
5. In a
Examination a candidate has to score minimum of 24 marks inorder to
clear the
exam.
The
maximum that he can score is 40 marks. Identify the Valid Equivalance
values if
the
student
clears the exam.
a) 22,23,26
b) 21,39,40
c) 29,30,31
d) 0,15,22
6. Which
of the following statements regarding static testing is false:
a) static testing requires
the running of tests through the code
b) static testing includes
desk checking
c) static testing includes techniques
such as reviews and inspections
d) static testing can give
measurements such as cyclomatic complexity
7.
Verification involves which of the following :-
i. Helps to check that we
have built product right.
ii. Helps to check that we
have built the right product.
iii. Helps in developing
the product
iv. Monitoring tool wastage
and obsoleteness.
a) Options i,ii,iii,iv are
true.
b) i is true and ii,iii,iv
are false
c) i,ii,iii are true and iv
is false
d) ii is true and i,iii,iv
are false.
8.
Component Testing is also called as :-
i. Unit
Testing
ii.
Program Testing
iii.
Module Testing
iv. System
Component Testing .
a) i,ii,iii are true and iv
is false
b) i,ii,iii,iv are false
c) i,ii,iv are true and iii
is false
d) all of above is true
9. Link
Testing is also called as :
a) Component Integration
testing
b) Component System Testing
c) Component Sub System
Testing
d)Maintenance testing
10. What
is the expected result for each of the following test cases?
Rule 1
Rule 2 Rule 3 Rule 4
Conditions
Indian
resident? False True TrueTrue
Age
between 18 – 55? Don’t care False True True
Married?
Don’t care Don’t care False True
Actions
Issue
Memebership? False False True True
Offer 10%
discount? False False True False
A.TC1: Anand is a 32 year
old married, residing in Kolkatta.
B.TC3: Attapattu is a 65
year old married person, residing in Colombo.
a. A – Issue membership,
10% discount, B – Issue membership, offer no discount. B
b. A – Don’t Issue
membership, B – Don’t offer discount. C
c. A – Issue membership, no
discount, B – Don’t Issue membership.
d. Issue membership, no
discount, B- Issue membership with 10% discount.
11.
Methodologies adopted while performing Maintenance Testing:-
a) Breadth Test and Depth
Test
b) Retesting
c) Confirmation Testing
d) Sanity Testing
12. Which
of the following is true about Formal Review or Inspection:-
i. Led by
Trained Moderator (not the author).
ii. No Pre
Meeting Preparations
iii.
Formal Follow up process.
iv. Main
Objective is to find defects
a) ii is true and i,iii,iv
are false
b) i,iii,iv are true and ii
is false
c) i,iii,iv are false and
ii is true
d) iii is true and I,ii,iv
are false
13. The
Phases of formal review process is mentioned below arrange them in the
correct
order.
i.
Planning
ii. Review
Meeting
iii. Rework
iv.
Individual Preparations
v. Kick
Off
vi. Follow
Up
a) i,ii,iii,iv,v,vi
b) vi,i,ii,iii,iv,v
c) i,v,iv,ii,iii,vi
d) i,ii,iii,v,iv,vi
14.
Consider the following state transition diagram of a two-speed hair dryer,
which is
operated
by pressing its one button. The first press of the button turns it on to
Speed 1,
second press to Speed 2 and the third press turns it off. Which of the
following
series of state transitions below will provide 0-switch coverage?
a. A,C,B
b. B,C,A
c. A,B,C
d. C,B,A
15. White
Box Techniques are also called as :-
a) Structural Testing
b) Design Based Testing
c) Error Guessing Technique
d) Experience Based
Technique
16. What
is an equivalence partition (also known as an equivalence class)?
a) A set of test cases for
testing classes of objects
b) An input or output range
of values such that only one value in the range becomes a
test case
c) An input or output range
of values such that each value in the range becomes a test
case
d) An input or output range
of values such that every tenth value in the range becomes
a test
case.
17. The
Test Cases Derived from use cases
a) Are most useful in
uncovering defects in the process flows during real world use of
the
system
b) Are most useful in
uncovering defects in the process flows during the testing use of
the
system
c) Are most useful in
covering the defects in the process flows during real world use of
the
system
d) Are most useful in
covering the defects at the Integration Level
18.
Exhaustive Testing is
a) Is impractical but
possible
b) Is practically possible
c) Is impractical and
impossible
d) Is always possible
19. Which
of the following is not a part of the Test Implementation and Execution
Phase
a) Creating test suites
from the test cases
b) Executing test cases
either manually or by using test execution tools
c) Comparing actual results
d) Designing the Tests
20. Which
of the following techniques is NOT a White box technique?
a) Statement Testing and
coverage
b) Decision Testing and
coverage
c) Condition Coverage
d) Boundary value analysis
21. A
Project risk includes which of the following :
a) Organizational Factors
b) Poor Software
characteristics
c) Error Prone software
delivered.
d) Software that does not
perform its intended functions
22. In a
risk-based approach the risks identified may be used to :
i.
Determine the test technique to be employed
ii.
Determine the extent of testing to be carried out
iii.
Prioritize testing in an attempt to find critical defects as early as possible.
iv.
Determine the cost of the project
a) ii is True; i, iii, iv
& v are False
b) i,ii,iii are true and iv
is false
c) ii& iii are True; i,
iv are False
d) ii, iii & iv are
True; i is false
23. Which
of the following is the task of a Tester?
i.
Interaction with the Test Tool Vendor to identify best ways to leverage test
tool
on the
project.
ii.
Prepare and acquire Test Data
iii.
Implement Tests on all test levels, execute and log the tests.
iv. Create
the Test Specifications
a) i, ii, iii is true and
iv is false
b) ii,iii,iv is true and i
is false
c) i is true and ii,iii,iv
are false
d) iii and iv is correct
and i and ii are incorrect
24. The
Planning phase of a formal review includes the following :-
a) Explaining the
objectives
b) Selecting the personnel,
allocating roles.
c) Follow up
d) Individual Meeting
preparations
25. A
Person who documents all the issues, problems and open points that were
identified
during a formal review.
a) Moderator.
b) Scribe
c) Author
d) Manager
26. Who
are the persons involved in a Formal Review :-
i. Manager
ii.
Moderator
iii.
Scribe / Recorder
iv.
Assistant Manager
a) i,ii,iii,iv are true
b) i,ii,iii are true and iv
is false.
c) ii,iii,iv are true and i
is false.
d) i,iv are true and ii,
iii are false.
27. Which
of the following is a Key Characteristics of Walk Through
a) Scenario , Dry Run ,
Peer Group
b) Pre Meeting Preparations
c) Formal Follow Up Process
d) Includes Metrics
28. What
can static analysis NOT find?
a) the use of a variable
before it has been defined
b) unreachable (“dead”)
code
c) memory leaks
d) array bound violations
29.
Incidents would not be raised against:
a) requirements
b) documentation
c) test cases
d) improvements suggested
by users
30. A Type
of functional Testing, which investigates the functions relating to
detection
of threats, such as virus from malicious outsiders.
a) Security Testing
b) Recovery Testing
c) Performance Testing
d) Functionality Testing
31. Which
of the following is not a major task of Exit criteria?
a) Checking test logs
against the exit criteria specified in test planning.
b) Logging the outcome of
test execution.
c) Assessing if more tests
are needed.
d) Writing a test summary
report for stakeholders.
32.
Testing where in we subject the target of the test , to varying workloads to
measure
and evaluate the performance behaviors and ability of the target and of
the test
to continue to function properly under these different workloads.
a) Load Testing
b) Integration Testing
c) System Testing
d) Usability Testing
33.
Testing activity which is performed to expose defects in the interfaces and in
the
interaction
between integrated components is :-
a) System Level Testing
b) Integration Level
Testing
c) Unit Level Testing
d) Component Testing
34. Static
analysis is best described as:
a) The analysis of batch
programs.
b) The reviewing of test
plans.
c) The analysis of program
code.
d) The use of black box
testing.
35. One of
the fields on a form contains a text box which accepts alpha numeric
values.
Identify the Valid Equivalence class
a) BOOK
b) Book
c) Boo01k
d) book
36.
Reviewing the test Basis is a part of which phase
a) Test Analysis and Design
b) Test Implementation and
execution
c) Test Closure Activities
d) Evaluating exit criteria
and reporting
37.
Reporting Discrepancies as incidents is a part of which phase :-
a) Test Analysis and Design
b) Test Implementation and
execution
c) Test Closure Activities
d) Evaluating exit criteria
and reporting
38. Which
of the following items would not come under Configuration
Management?
a) operating systems
b) test documentation
c) live data
d) user requirement
document
39.
Handover of Testware is a part of which Phase
a) Test Analysis and Design
b) Test Planning and
control
c) Test Closure Activities
d) Evaluating exit criteria
and reporting
40. The
Switch is switched off once the temperature falls below 18 and then it is
turned on
when the temperature is more than 21. When the temperature is more
than 21.
Identify the Equivalance values which belong to the same class.
a) 12,16,22
c) 22,23,24
d) 14,15,19
Answers:
1 b 11 a 21 a 31 b
2 a 12 b 22 b 32 a
3 b 13 c 23 b 33 b
4 a 14 c 24 b 34 c
5 c 15 a 25 b 35 c
6 a 16 b 26 b 36 a
7 b 17 a 27 a 37 b
8 a 18 a 28 c 38 c
9 a 19 d 29 d 39 c