41: To set a Quick Test Professional test as a
template test, right-click the test in the test plan tree, and choose _________
A. Template
Test
B. Template
Tree
C. Template
Plan
D. Template
42: You can change the label of any of the
test detail fields.
A.
True
B. False
43: A question mark icon in the test plan tree
indicates that the QuickTest Professional add-in is _________ on your machine.
A. Not activated
B. Not installed
C. Not enabled
D. Not set
44: A ________ link is included in the e-mail,
enabling the recipient to go directly to the test.
A. Link To Test
B. Move To
Test
C. Go To
Test
D. Test
45: In the Test Plan module, you create ________ by selecting requirements to link to a test.
45: In the Test Plan module, you create ________ by selecting requirements to link to a test.
A. RTM
B. Requirements
coverage
C. Test
coverage
D. SRS
46: Alternatively, in the Requirements module,
you create _______ by selecting tests to link to a requirement.
A. RTM
B. Requirements
coverage
C. Test
coverage
D. SRS
47: A test can cover more than one
requirement, and a requirement can be covered by only one test.
A.
True
B. False
48: You can also create coverage between test
instances and requirements. You can enable this feature using the __________
parameter in Site Administration
A. ALLOW_REQ_COVERAGE_BY_TEST_INSTANCE
B. ALLOW_TEST_COVERAGE_BY_REQ_INSTANCE
C. ALLOW_R_COVERAGE_BY_T_INSTANCE
D. None of above
B. ALLOW_TEST_COVERAGE_BY_REQ_INSTANCE
C. ALLOW_R_COVERAGE_BY_T_INSTANCE
D. None of above
49: Requirements coverage is created
automatically when you convert a requirement to a test. Therefore, even if you
have not yet added requirements coverage, it may already exist.
A.
True
B. False
50: You can also define requirements coverage
by dragging a requirement in the requirements tree to the coverage grid. The
requirement is added to the coverage grid without its child requirements.
A.
True
B. False
|
41
|
42
|
43
|
44
|
45
|
46
|
47
|
48
|
49
|
50
|
|
A
|
A
|
B
|
C
|
B
|
C
|
B
|
A
|
A
|
A
|
51: Each requirement type with risk-based
quality management enabled supports either.
A. Risk analysis or risk
assessment
B. Risk breakdown or risk assessment
C. Risk breakdown or risk review
C. Risk breakdown or risk review
D. Risk analysis or risk evaluation
52: Performing a risk-based quality management
analysis for an analysis requirement involves the following steps
A. Determine Risk groups, Define Testing
Policy Settings, Finalize Testing Policy, Analyze Testing Strategy
B. Determine Risk Categories, Define Testing guidelines Settings, Finalize Testing Policy, Analyze Testing Strategy
C. Determine Risk Categories, Define Testing Policy Settings, Finalize Testing guidelines, Analyze Testing Strategy
D. Determine Risk Categories, Define Testing Policy Settings, Finalize Testing Policy, Analyze Testing Strategy
B. Determine Risk Categories, Define Testing guidelines Settings, Finalize Testing Policy, Analyze Testing Strategy
C. Determine Risk Categories, Define Testing Policy Settings, Finalize Testing guidelines, Analyze Testing Strategy
D. Determine Risk Categories, Define Testing Policy Settings, Finalize Testing Policy, Analyze Testing Strategy
53: A __________ requirement is a requirement
belonging to a type that represents higher levels in the requirements tree
hierarchy, such as the Folder type.
A.
Analysis
B.
Assessment
C.
Policy
D. Test
54: A _________ requirement is a requirement belonging to a type that represents requirements that are children of analysis requirements and at a lower level in the requirements tree hierarchy.
54: A _________ requirement is a requirement belonging to a type that represents requirements that are children of analysis requirements and at a lower level in the requirements tree hierarchy.
A.
Analysis
B.
Assessment
C.
Policy
D. Test
55: For each assessment requirement under the
analysis requirement, you determine the Risk Category. The Risk Category is
composed of two factors.
A. Business Probability and Failure
Criticality
B. Business Vitality and Failure
Probability
C. Business Criticality and Failure
Probability
D. Business Criticality and Failure Possibility
D. Business Criticality and Failure Possibility
56: The
Business Criticality of a requirement has three possible values:
A. Critical, Important, Nice to
Have
B. Critical, Importance, Nice to Have
C. Critical, Important, Nice to Had
C. Critical, Important, Nice to Had
D. None of these
57: The Failure Probability of a requirement
has three possible values:
A. High, Standard, Low
A. High, Standard, Low
B. High, Average, Low
C. High, Medium, Low
C. High, Medium, Low
D. None of these
58: Quality Center defines four Testing
Levels.
A. Full, Partial, Basic, and
Low
B. Full, Partial, Basic, and None
C. Full, Half, Basic, and None
C. Full, Half, Basic, and None
D. Full, Partial, Critical, and None
59: The Business Criticality of a requirement
is a measure of how likely a test on the requirement is to fail, based on the
technical complexity of the requirements implementation, without consideration
of the requirements impact on the business.
A.
True
B. False
60: The Failure Probability of a requirement
is a measure of how important the requirement is to your business
A.
True
B. False
|
51
|
52
|
53
|
54
|
55
|
56
|
57
|
58
|
59
|
60
|
|
A
|
D
|
A
|
B
|
C
|
A
|
C
|
B
|
B
|
B
|
61: You
can add a new defect to a Quality Center project from any module at any stage
of the testing process.
A. True
A. True
B. False
62: There are two methods you can use to conduct a search for similar/related defects:
A. Find parallel Defects & Find parallel Text.
B. Find related Defects & Find related Text.
C. Find Similar Defects & Find Similar Text.
D. Find all Defects & Find all Text.
63: You can update defects directly in the _____ or in the ______ dialog box.
A. Defects Grid
62: There are two methods you can use to conduct a search for similar/related defects:
A. Find parallel Defects & Find parallel Text.
B. Find related Defects & Find related Text.
C. Find Similar Defects & Find Similar Text.
D. Find all Defects & Find all Text.
63: You can update defects directly in the _____ or in the ______ dialog box.
A. Defects Grid
B. Defects
Detail
C. Defects
Module
D. Both A &
B E:
Both B & C
64: You can only see changes made to a defect
for selected fields predefined by the project administrator in Project
Customization.
A. True
A. True
B. False
65: By default, Quality Center sends e-mail in HTML format. To send e-mail as plain text instead, edit the parameter in the Site Configuration tab in Site Administration
A. M_FORMAT
65: By default, Quality Center sends e-mail in HTML format. To send e-mail as plain text instead, edit the parameter in the Site Configuration tab in Site Administration
A. M_FORMAT
B.
MAIL_FORMAT_ID
C. MAIL_FORM
D. MAIL_FORMAT
66: You can link a defect to the run steps and other defects.
A. True
66: You can link a defect to the run steps and other defects.
A. True
B. False
67: You can only remove direct links from the Linked Defects grid. Indirect links are removed automatically when the direct links are removed.
A. True
67: You can only remove direct links from the Linked Defects grid. Indirect links are removed automatically when the direct links are removed.
A. True
B. False
68: Quality Center reports can be generated from the
A. Requirements,Test Plan,Test Lab,Defects modules.
B. Requirements,Test Plan,Defects modules.
C. Requirements & Test Plan modules.
D. Requirements,Test Plan,Test Lab modules.
69: You can export grid data as a text file, Microsoft Excel spreadsheet, Microsoft Word document, or HTML document. You export data from the
A. Requirements Grid & Defects Grid.
B. Requirements Grid,Execution Grid, or Defects Grid.
C. Requirements Grid, Test Grid, Execution Grid, or Defects Grid.
D. Requirements Grid, Test Grid, Execution Grid.
70: How many Reports (Not Sub-Reports: are available in Requirements module.
A. 5
68: Quality Center reports can be generated from the
A. Requirements,Test Plan,Test Lab,Defects modules.
B. Requirements,Test Plan,Defects modules.
C. Requirements & Test Plan modules.
D. Requirements,Test Plan,Test Lab modules.
69: You can export grid data as a text file, Microsoft Excel spreadsheet, Microsoft Word document, or HTML document. You export data from the
A. Requirements Grid & Defects Grid.
B. Requirements Grid,Execution Grid, or Defects Grid.
C. Requirements Grid, Test Grid, Execution Grid, or Defects Grid.
D. Requirements Grid, Test Grid, Execution Grid.
70: How many Reports (Not Sub-Reports: are available in Requirements module.
A. 5
B.
6
C.
7
D. 4
|
61
|
62
|
63
|
64
|
65
|
66
|
67
|
68
|
69
|
70
|
|
A
|
C
|
D
|
A
|
D
|
A
|
A
|
A
|
C
|
B
|
71:
Using Quality Center Test Lab module, executing tests also consists of
__________
A. Run Tests
Automatically
B. Run Tests Manually
C. Both A and B
C. Both A and B
D. None of above
72: You can access the Test Lab menu bar from
the Test Lab module by pressing the shortcut key ______
A.
F6
B.
F7
C.
F8
D. F9
73: The Test Lab module includes the following
toolbars:
A. Test Set and Select
Tests
B. Test Select and Set Tests
C. Set Test and Tests Select
C. Set Test and Tests Select
D. None of above
74: In the Test Lab Module, in Execution Grid
Columns, the column Exec Date means
A. The date on which the test was first
executed.
B. The date on which the test was last executed
C. The date on which the test was executed
D. The date on which the test will be executed in future
B. The date on which the test was last executed
C. The date on which the test was executed
D. The date on which the test will be executed in future
75: You can add user-defined fields and change
the label of any of the fields in the Execution Grid.
A.
True
B. False
76: You can organize test execution by
creating _______
A. Test
modules
B. Test
flows
C. Test
beds
D. Test sets
77: While creating test sets, after you design
tests in the Test Plan module, you create a _______
A. Test sets
tree
B. Test sets
flow
C. Test sets
grid
D. Test sets rows
78: By default, the uppermost level in a test
sets tree is the ________
A. Level 0 folder
B. Top
folder
C. Highest level folder
D. Root folder
79: You can also use the _________ in the Test
Instance Properties dialog box (Changing the Default Failure Rules for Specific
Tests) to set the on failure rules for a test in a test set.
A. Run Events view
B. Run Events Grid
C. Run Events menu
D. Run Eventsmodule
80: You can also drag the test sets between
lists.
A.
True
B. False
|
71
|
72
|
73
|
74
|
75
|
76
|
77
|
78
|
79
|
80
|
|
C
|
D
|
A
|
B
|
A
|
D
|
A
|
D
|
A
|
A
|
No comments:
Post a Comment